Located in Dubai, the 01‑S003 Nad Al Sheba Development Infrastructure Works involved BIM‑based modeling and coordination of complex road and wet and dry utility networks. BIM Studio delivered accurate 3D models, clash detection, and quantity take‑offs, enabling optimized earthworks, grading, and construction‑ready infrastructure designs.