The Saudi Arabia project by KEO Consultants involves developing schematic designs into coordinated BIM models (LOD 350–400) for front and back of house areas, MEP systems, and pool works, including Revit-based design development, FF&E and joinery families, and tender and IFC documentation within 6 months.